EZINE:
We search back through the Computer Weekly archives held at The National Museum of Computing to present what was happening in IT over the past five decades.
RESOURCE:
The secret is out about the benefits of using a cloud-based workplace collaboration tool, which companies rely on to increase employee productivity while in the midst of a content tsunami. Participate in our survey today for complete access to a printable chart, and start comparing 10 top cloud collaboration vendors & features for your company.
EZINE:
This month's MicroScope ezine looks at the issues around device as a service (DaaS), the outlook from HP and a report from the UK CompTIA conference.
WHITE PAPER:
This brief whitepaper explains how the Indonesian Stock Exchange (IDX) was able to half its hardware costs by leveraging a Linux system to support trading machines, surveillance machines, database engines, and more.
EGUIDE:
In this e-guide: Simplifying the deployment and management of datacentre hardware systems is one of the main draws of converged and hyper-converged infrastructure setups for enterprises.
BROCHURE:
Explore this resource to find out how HP's ConvergedSystem for Virtualization can drive faster time-to-value while providing the scalability you need.
EGUIDE:
When it comes to choosing between a hardware load balancer and a software load balancer, there are several key factors to consider. In this e-guide, get an in-depth look at hardware and software load balancing, the differences between each, and how to select the right one for your organization.
EGUIDE:
An aging data center may no longer be able to meet the power, cooling, and structural demands of advancing technologies. This exclusive e-guide details five data center upgrade strategies to modernize your facility and Robert McFarlane, with over 35 years experience in data center design, power, and cooling, offers data center design advice.
DATA SHEET:
Optimize data center space and performance with the PowerEdge™ C8000, featuring compute, GPU and storage nodes to run several workloads in one chassis.